Buy wisely
Buy wiselyBuy wisely
For RetailersFor developers
  1. Home
  2. Pets
  3. Dog
  4. Other Dog Supplies
  5. Dog collars & leads
  6. Rogz Control Long Lead - Blue
Buy wisely

BuyWisely is your one stop price comparison platform, delivering the best deals from over 20,000 online shops. We empower shoppers to make smart, cost-effective choices by offering transparent pricing, price history, and the latest deals across a broad range of products. With BuyWisely, your money goes further.

Popular Shops
JB Hi-Fi
The Good Guys
Harvey Norman
Appliances Online
Bing Lee
Kogan
Amazon
Officeworks
Contact Us
[email protected]
Affiliate Disclosure
Legal Information
Privacy Policy
Logos provided by Logo.dev
Β© 2026 BuyWiselyβ€’Price data powered by pricesAPI.ioβ€’Retailers: SellWisely.io
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue
Rogz Control Long Lead - Blue

Rogz Control Long Lead - Blue

(16 reviews)

Rogz Utility Control Leads are recommended for behavior correction and training. A soft neoprene handle and shock-absorbing webbing reduces strain on you and your dog to help prevent injury. For close control, the ShocLoc control feature allows you to lock out the shock-absorbing webbing. Waste bag and accessory holders are convenient, and a Snap Loc trigger hook enables easy attachment and safety. Product features Reflective Stitching Reflective yarn is woven into the webbing for nighttime visibility. ShockLoc TM Control Designed to Lockout the absorbing function of the bungee. Waste Bag Holder Accessory to hold your waste bag. Shock Absorbing Webbing Eases the pull strength placed on you and your dog. SnapLocTM Trigger Hook Lockable Trigger Hook to ensure control & safety.

Rogz Utility Control Leads are recommended for behavior correction and training. A soft neoprene handle and shock-absorbing webbing reduces strain on you and your dog to help prevent injury. For close control, the ShocLoc control feature allows you to lock out the shock-absorbing webbing. Waste bag and accessory holders are convenient, and a Snap Loc trigger hook enables easy attachment and safety. Product features Reflective Stitching Reflective yarn is woven into the webbing for nighttime visibility. ShockLoc TM Control Designed to Lockout the absorbing function of the bungee. Waste Bag Holder Accessory to hold your waste bag. Shock Absorbing Webbing Eases the pull strength placed on you and your dog. SnapLocTM Trigger Hook Lockable Trigger Hook to ensure control & safety.

$39.99 - $57.99

in 13 offers

last seen 13 May 2026

The lowest price we last saw for Rogz Control Long Lead - Blue was $39.99 at Habitat Pet Supplies, compared across 11 retailers (last seen 13 May 2026). Prices may have changed since.

The all-time low we recorded was $25.91 on 1 Dec 2025.

Prices last updated 13 May 2026.

Size:

XL-120 cm

Rogz Control Long Lead - Blue

$39.99

last seen 13 May 2026
(16 reviews)

Rogz Utility Control Leads are recommended for behavior correction and training. A soft neoprene handle and shock-absorbing webbing reduces strain on you and your dog to help prevent injury. For close control, the ShocLoc control feature allows you to lock out the shock-absorbing webbing. Waste bag and accessory holders are convenient, and a Snap Loc trigger hook enables easy attachment and safety. Product features Reflective Stitching Reflective yarn is woven into the webbing for nighttime visibility. ShockLoc TM Control Designed to Lockout the absorbing function of the bungee. Waste Bag Holder Accessory to hold your waste bag. Shock Absorbing Webbing Eases the pull strength placed on you and your dog. SnapLocTM Trigger Hook Lockable Trigger Hook to ensure control & safety.

Rogz Utility Control Leads are recommended for behavior correction and training. A soft neoprene handle and shock-absorbing webbing reduces strain on you and your dog to help prevent injury. For close control, the ShocLoc control feature allows you to lock out the shock-absorbing webbing. Waste bag and accessory holders are convenient, and a Snap Loc trigger hook enables easy attachment and safety. Product features Reflective Stitching Reflective yarn is woven into the webbing for nighttime visibility. ShockLoc TM Control Designed to Lockout the absorbing function of the bungee. Waste Bag Holder Accessory to hold your waste bag. Shock Absorbing Webbing Eases the pull strength placed on you and your dog. SnapLocTM Trigger Hook Lockable Trigger Hook to ensure control & safety.

M
XL-80 cm
XL-80cm
XL-120cm

Price comparison

Price data powered by pricesAPI.io

Last updated at 13/05/2026 17:23:06

Please note: price history and price alerts are not available for some stores, including Amazon.com.au.
https://www.google.com/s2/favicons?domain=habitatpets.com.au&sz=64Habitat Pet Supplies

$39.99

Rogz Classic Control Extra Large Long Dog Lead Blue***

Delivery between 19–25 May $6.99

https://www.google.com/s2/favicons?domain=petstation.com.au&sz=64Pet Station

$45.99

Rogz Control Shock Absorbing Bungee Dog Long Lead Blue XL

Delivery between 20–23 May $11

https://www.google.com/s2/favicons?domain=ebay.com.au&sz=64eBay.com.au

$47.12

Rogz Utility Control Long Lead - Xlarge (blue)

Free delivery

Affiliate Disclosure: We may receive a small commission for purchases made through this link at no extra cost to you. This helps support our site. Thank you!

https://www.google.com/s2/favicons?domain=petsuppliesempire.com.au&sz=64Pet Supplies Empire

$47.49

XL-120cm / Blue Rogz Utility Control Lead Blue | Dog Collar

Delivery between 15–26 May $8.95

https://www.google.com/s2/favicons?domain=vetnpetdirect.com.au&sz=64vet-n-pet Direct

$49.95

Rogz Utility Control Lead, 1.2m / Blue

Delivery between Mon – Wed $8.95

https://www.google.com/s2/favicons?domain=budgetpetproducts.com.au&sz=64Budget Pet Products

$50.66

Rogz Control Shock Absorbing Bungee Long Lead Blue XL For Dogs by Budget Pet Products

Free delivery between 15–25 May

https://www.google.com/s2/favicons?domain=petcircle.com.au&sz=64Pet Circle

$50.99

Rogz Control Long Lead Blue X Large for Medium to Large Dogs - Durable and Reflective Walking Accessory for Safety and Comfort

Free delivery

https://www.google.com/s2/favicons?domain=petcity.com.au&sz=64Pet City

$51.95

Lead Rogz Control Long Blue XL 25mm

Delivery between Mon – Wed $7.74

https://www.google.com/s2/favicons?domain=bigw.com.au&sz=64BIG W

$57.99

Rogz Control Shock Absorbing Bungee Dog Long Lead Blue XL

Free delivery

https://www.google.com/s2/favicons?domain=woolworths.com.au&sz=64Woolworths

$57.99

Rogz Control Shock Absorbing Bungee Dog Long Lead Blue XL

Delivery between 18–28 May $10

Price history

Price history

Please note: price history and price alerts are not available for some stores, including Amazon.com.au.

Reviews

12 November 2020Brad

originally posted on catch.com.au

Not worth the price, used a handful of times and the elastic became stretched and useless.

14 May 2024Brea

originally posted on catch.com.au

Great service, amazing team, 7 stars out of 5

1 October 2023Krista

originally posted on templeandwebster.com.au

Love this chair. Think it looks great and is comfortable

Specification

MEDIUM (M)16mm / 5.8”
XL (Short)25mm / 1”
XL (Long)25mm / 1”

Price comparison

Updated 6 months ago
Please note: price history and price alerts are not available for some stores, including Amazon.com.au.
https://www.google.com/s2/favicons?domain=habitatpets.com.au&sz=64
Habitat Pet Supplies

$39.99

Rogz Classic Control Extra Large Long Dog Lead Blue***

Delivery between 19–25 May $6.99

https://www.google.com/s2/favicons?domain=petstation.com.au&sz=64
Pet Station

$45.99

Rogz Control Shock Absorbing Bungee Dog Long Lead Blue XL

Delivery between 20–23 May $11

https://www.google.com/s2/favicons?domain=ebay.com.au&sz=64
eBay.com.au

$47.12

Rogz Utility Control Long Lead - Xlarge (blue)

Free delivery

Affiliate Disclosure: We may receive a small commission for purchases made through this link at no extra cost to you. This helps support our site. Thank you!

https://www.google.com/s2/favicons?domain=petsuppliesempire.com.au&sz=64
Pet Supplies Empire

$47.49

XL-120cm / Blue Rogz Utility Control Lead Blue | Dog Collar

Delivery between 15–26 May $8.95

https://www.google.com/s2/favicons?domain=vetnpetdirect.com.au&sz=64
vet-n-pet Direct

$49.95

Rogz Utility Control Lead, 1.2m / Blue

Delivery between Mon – Wed $8.95

Price history

Price history

Please note: price history and price alerts are not available for some stores, including Amazon.com.au.

Reviews

12 November 2020

Not worth the price, used a handful of times and the elastic became stretched and useless.

Brad originally posted on catch.com.au
14 May 2024

Great service, amazing team, 7 stars out of 5

Brea originally posted on catch.com.au
1 October 2023

Love this chair. Think it looks great and is comfortable

Krista originally posted on templeandwebster.com.au
Awful
5 June 2023

This leash was a complete waste of money. The hook that enables you to switch from bungee/non stretch constantly falls off the on only a few days of use. I went to petstock to see if there were others like this and they ALL do it. Unhooks and swings around and hits your doggo when walking and running so you are constantly replacing it. Did anyone at Rogz actually test this before release?

originally posted on petcircle.com.au
Beautiful harness
18 January 2018

Brought one for our 5 month old Kelpie/German Shepherd/Husky mix puppy, she loves it and hardly realises shes wearing it. She still pulls while walking in it but not as much as before and shes easier to control while walking. Also were becoming huge fans of the Rogz brand as they have great quality products.

Rae L originally posted on petstock.com.au
Less shoulder. And arm pull
17 March 2022

This lead saves my arm and shoulder from extreme pulling from our cocker spaniel. It’s a great purchase

Stephturk originally posted on vetnpetdirect.com.au
Needs tweaking
27 November 2022

It's a great concept. Not a bad lead but needs a bit of tweaking to make a great lead. The hook is constantly falling out of the hold and swinging freely. Especially when you want it on non stretch, forever stopping to reattach.

Campbell originally posted on petcircle.com.au
Outdoor dog essential!
22 April 2018

My german shepherd is outdoors of a day time and I couldnt imagine her out there without one of these beds. They are just versatile for every season. They keep her off the hot ground and provide air circulation in hotter months and off the cold pavement in colder months. They deter fleas and are easy to wash with just a spray of a hose and they dry really quickly compared to traditional bedding. In fact if it is hot enough (but not too hot so she has to be inside in the aircon) I will spray the bed with the hose so she can lay on it and stay cool in the shade.I have always had these trampoline beds for my dogs and they are fantastic, but all dogs may not like them as they have different comfort requirements. These beds have a sturdy frame but after a few years they ...Β MoreMy german shepherd is outdoors of a day time and I couldnt imagine her out there without one of these beds. They are just versatile for every season. They keep her off the hot ground and provide air circulation in hotter months and off the cold pavement in colder months. They deter fleas and are easy to wash with just a spray of a hose and they dry really quickly compared to traditional bedding. In fact if it is hot enough (but not too hot so she has to be inside in the aircon) I will spray the bed with the hose so she can lay on it and stay cool in the shade.I have always had these trampoline beds for my dogs and they are fantastic, but all dogs may not like them as they have different comfort requirements. These beds have a sturdy frame but after a few years they do begin to show signs of weathering and rust.

Jessica D originally posted on petstock.com.au
Phenomenal Control Leads
6 October 2023

Work at a Doggy Day Care - these are the best leads to keep the bigger pups in close so they don't pull you over (you can keep your centre of gravity) - with a glove these go great. The XL is the way to go. Never had the hook fall out ever (some people claim they do)... I replace about every 6-12 months (the bungees eventually give out (noting - I use these 2-3 hours every day so should last a pet owner a lot longer) and not one hook has been problematic. EzyDog also do a short zero shock lead which is great too - the extra hooks near the handle give extra flexibility. If you want to keep your balance with the bigger dogs these are the way to go.

Rolly originally posted on petcircle.com.au
lumberjack
22 September 2021

This is my second lumberjack lead, first one part of the clip broke off. But I do like this lead,

marie w. originally posted on vetnpetdirect.com.au

Specification

MEDIUM (M)16mm / 5.8”
XL (Short)25mm / 1”
XL (Long)25mm / 1”